Get in touch
Sales Enquiries
+977 9801037556 (Nepal) +44 20 3336 9262 (UK)Career or Job Applications
hello@omegaincorporations.com


How Long Does It Take to Build a Mobile App? A Phase-by-Phase Timeline

Building a mobile app takes time, planning, and the right execution strategy. Whether it’s a startup MVP or an enterprise-grade solution, development timelines directly impact budgets, hiring plans, marketing campaigns, and investor expectations. Knowing how long each stage takes helps you set realistic goals, avoid scope creep, and launch successfully.
This guide breaks down the mobile app development process step by step, explains the factors that affect timelines, and shares proven ways to speed up delivery without sacrificing quality.
Understanding the Mobile App Development Timeline
When people ask “How long does it take to build a mobile app?”, the answer usually covers three different timeframes:
Calendar time – The total time from project kickoff to launch.
Development effort – The number of hours or person-months required.
Time-to-market – Includes marketing, app store reviews, and rollout strategy.
Key factors influencing timelines:
Platform choice (iOS, Android, or cross-platform)
Feature set and number of integrations
Third-party APIs (payments, maps, authentication)
Compliance (e.g., finance, healthcare)
Team setup (outsourced vs. in-house vs. hybrid)
Pro Tip: Discovery isn’t optional. Skipping it might save weeks upfront, but it almost always adds months of delays later.
Phase 1: Discovery & Planning (2–6 Weeks)
Discovery is where ideas become actionable plans.
Activities include:
Product workshops & stakeholder interviews
User research & competitor analysis
Technical feasibility checks
MVP scope definition & roadmap creation
Deliverables:
Product Requirement Document (PRD)
Ranked MVP feature list
Wireframes or user flows
Milestone schedule with cost estimates
Why it matters:
Prevents late-stage scope shifts
Surfaces technical challenges early
Aligns business and technical teams
Checklist for effective discovery:
Define 3 measurable KPIs for launch
Validate assumptions with prototypes or interviews
Confirm integrations & data requirements early
For structured discovery support, explore our services.
Phase 2: UX/UI Design (3–8 Weeks)
Strong design makes your app usable, appealing, and efficient to build.
Design activities:
Low-fidelity wireframes
High-fidelity UI mockups & interactive prototypes
Design system & reusable components
Usability & accessibility testing
Timeline drivers:
Number of screens
Custom animations vs. standard UI components
Feedback cycles
Ways to shorten design time:
Reuse established UI patterns
Limit review loops to 2–3 iterations
Validate flows with prototypes before final visuals
For MVP-focused projects, read Why Minimum Viable Product (MVP) Development Is Smart for Modern Businesses.
Phase 3: Development (8 Weeks – 16+ Months)
Development is the most time-intensive stage. Timelines vary by scope and approach.
Estimated timelines:
MVP: 8–12 weeks
Medium app: 4–6 months
Enterprise app: 8–16+ months
Team models:
In-house team: slower, competing priorities
Outsourced team: faster, full-time focus
Hybrid model: product management in-house, development outsourced
Tech choices that affect speed:
Cross-platform frameworks (Flutter, React Native) shorten build time
Backend-as-a-Service (BaaS) accelerates MVPs
Native builds take longer but provide best performance
Acceleration tips:
Run design and backend work in parallel
Use proven libraries, not custom low-level code
Maintain predictable sprint rhythms
Phase 4: QA & Testing (2–6 Weeks)
Quality assurance ensures a smooth, reliable user experience across devices and environments.
Testing covers:
Functional testing
Regression testing
Integration testing with APIs
Device & OS compatibility checks
Performance, security & user acceptance testing
How to save time:
Start QA early in each sprint
Automate regression tests
Maintain a device lab with top models
Define acceptance criteria upfront
Phase 5: Deployment & Launch (1–4 Weeks)
Submitting to app stores requires both technical preparation and launch planning.
Activities include:
Store listings (descriptions, screenshots, videos)
Privacy policy and permissions setup
Closed beta testing or soft launch
Post-launch monitoring (analytics, crash reporting, reviews)
App Store timelines:
Apple: 1–5 business days (longer for complex apps)
Google Play: usually faster but variable
Best practices:
Soft launch in a limited region first
Use feature flags to control rollouts
Prepare 30 days of post-launch bug fixes
Phase 6: Maintenance & Scaling (Ongoing)
The real work begins after launch. Continuous updates and improvements keep your app competitive.
Ongoing tasks:
OS updates & bug fixes
Monitoring & scaling backend systems
Security patches & audits
Feature enhancements based on analytics
Effort required:
Small apps: 10–30 hours/month
Growth apps: at least 1 full-time developer + QA
Enterprise apps: separate DevOps, QA, and product iteration teams
Why it matters:
Neglect leads to crashes, churn, and bad reviews
Iteration improves retention and lifetime value
Proactive scaling prevents downtime
Final Takeaway: How Long Does It Really Take?
A realistic mobile app development timeline looks like this:
Discovery & Planning: 2–6 weeks
UX/UI Design: 3–8 weeks
Development: 8 weeks–16+ months
QA & Testing: 2–6 weeks
Deployment & Launch: 1–4 weeks
Maintenance: Continuous
With proper planning, validated assumptions, and the right team setup, you can accelerate delivery and ensure smoother launches.
Frequently Asked Questions
It usually takes about 2–4 months, including design, coding, testing, and submission.
Build an MVP, use cross-platform frameworks, reuse components, and run design + development in parallel. Timeline: 8–12 weeks.
For Apple it usually takes 1–5 business days while Google Play is usually quicker, but still variable.
Yes, flutter and React Native reduce duplicate work for iOS & Android.
For Small apps it usually takes 10–30 hrs/month whereas for larger apps it takes at least 1 full-time engineer + QA.
