Drag

Chat With Us

How Long Does It Take to Build a Mobile App? A Phase-by-Phase Timeline

Build your first mobile app

Building a mobile app takes time, planning, and the right execution strategy. Whether it’s a startup MVP or an enterprise-grade solution, development timelines directly impact budgets, hiring plans, marketing campaigns, and investor expectations. Knowing how long each stage takes helps you set realistic goals, avoid scope creep, and launch successfully.

This guide breaks down the mobile app development process step by step, explains the factors that affect timelines, and shares proven ways to speed up delivery without sacrificing quality.

Understanding the Mobile App Development Timeline

When people ask “How long does it take to build a mobile app?”, the answer usually covers three different timeframes:

  1. Calendar time – The total time from project kickoff to launch.

  2. Development effort – The number of hours or person-months required.

  3. Time-to-market – Includes marketing, app store reviews, and rollout strategy.

Key factors influencing timelines:

  • Platform choice (iOS, Android, or cross-platform)

  • Feature set and number of integrations

  • Third-party APIs (payments, maps, authentication)

  • Compliance (e.g., finance, healthcare)

  • Team setup (outsourced vs. in-house vs. hybrid)

Pro Tip: Discovery isn’t optional. Skipping it might save weeks upfront, but it almost always adds months of delays later.

Phase 1: Discovery & Planning (2–6 Weeks)

Discovery is where ideas become actionable plans.

Activities include:

  • Product workshops & stakeholder interviews

  • User research & competitor analysis

  • Technical feasibility checks

  • MVP scope definition & roadmap creation

Deliverables:

  • Product Requirement Document (PRD)

  • Ranked MVP feature list

  • Wireframes or user flows

  • Milestone schedule with cost estimates

Why it matters:

  • Prevents late-stage scope shifts

  • Surfaces technical challenges early

  • Aligns business and technical teams

Checklist for effective discovery:

  • Define 3 measurable KPIs for launch

  • Validate assumptions with prototypes or interviews

  • Confirm integrations & data requirements early

For structured discovery support,  explore our services

Phase 2: UX/UI Design (3–8 Weeks)

Strong design makes your app usable, appealing, and efficient to build.

Design activities:

  • Low-fidelity wireframes

  • High-fidelity UI mockups & interactive prototypes

  • Design system & reusable components

  • Usability & accessibility testing

Timeline drivers:

  • Number of screens

  • Custom animations vs. standard UI components

  • Feedback cycles

Ways to shorten design time:

  • Reuse established UI patterns

  • Limit review loops to 2–3 iterations

  • Validate flows with prototypes before final visuals

For MVP-focused projects, read Why Minimum Viable Product (MVP) Development Is Smart for Modern Businesses.

Phase 3: Development (8 Weeks – 16+ Months)

Development is the most time-intensive stage. Timelines vary by scope and approach.

Estimated timelines:

  • MVP: 8–12 weeks

  • Medium app: 4–6 months

  • Enterprise app: 8–16+ months

Team models:

  • In-house team: slower, competing priorities

  • Outsourced team: faster, full-time focus

  • Hybrid model: product management in-house, development outsourced

Tech choices that affect speed:

  • Cross-platform frameworks (Flutter, React Native) shorten build time

  • Backend-as-a-Service (BaaS) accelerates MVPs

  • Native builds take longer but provide best performance

Acceleration tips:

  • Run design and backend work in parallel

  • Use proven libraries, not custom low-level code

  • Maintain predictable sprint rhythms

Phase 4: QA & Testing (2–6 Weeks)

Quality assurance ensures a smooth, reliable user experience across devices and environments.

Testing covers:

  • Functional testing

  • Regression testing

  • Integration testing with APIs

  • Device & OS compatibility checks

  • Performance, security & user acceptance testing

How to save time:

  • Start QA early in each sprint

  • Automate regression tests

  • Maintain a device lab with top models

  • Define acceptance criteria upfront

Phase 5: Deployment & Launch (1–4 Weeks)

Submitting to app stores requires both technical preparation and launch planning.

Activities include:

  • Store listings (descriptions, screenshots, videos)

  • Privacy policy and permissions setup

  • Closed beta testing or soft launch

  • Post-launch monitoring (analytics, crash reporting, reviews)

App Store timelines:

  • Apple: 1–5 business days (longer for complex apps)

  • Google Play: usually faster but variable

Best practices:

  • Soft launch in a limited region first

  • Use feature flags to control rollouts

  • Prepare 30 days of post-launch bug fixes

Phase 6: Maintenance & Scaling (Ongoing)

The real work begins after launch. Continuous updates and improvements keep your app competitive.

Ongoing tasks:

  • OS updates & bug fixes

  • Monitoring & scaling backend systems

  • Security patches & audits

  • Feature enhancements based on analytics

Effort required:

  • Small apps: 10–30 hours/month

  • Growth apps: at least 1 full-time developer + QA

  • Enterprise apps: separate DevOps, QA, and product iteration teams

Why it matters:

  • Neglect leads to crashes, churn, and bad reviews

  • Iteration improves retention and lifetime value

  • Proactive scaling prevents downtime

Final Takeaway: How Long Does It Really Take?

A realistic mobile app development timeline looks like this:

  • Discovery & Planning: 2–6 weeks

  • UX/UI Design: 3–8 weeks

  • Development: 8 weeks–16+ months

  • QA & Testing: 2–6 weeks

  • Deployment & Launch: 1–4 weeks

  • Maintenance: Continuous
    With proper planning, validated assumptions, and the right team setup, you can accelerate delivery and ensure smoother launches.


Frequently Asked Questions

It usually takes about 2–4 months, including design, coding, testing, and submission.

Build an MVP, use cross-platform frameworks, reuse components, and run design + development in parallel. Timeline: 8–12 weeks.

For Apple it usually takes 1–5 business days while Google Play is usually quicker, but still variable.

Yes, flutter and React Native reduce duplicate work for iOS & Android.

For Small apps it usually takes 10–30 hrs/month whereas for larger apps it takes at least 1 full-time engineer + QA.

Share with:

Grow with us

We Would Love to Hear More About Your Project!